Bridge Decks and Plow Timing: Questions for Your Supervisor
What should a crew ask about plowing and treating bridge decks, and how does it affect the edge?
Read the guide
Mailbox Strikes and Driveway Windrows: Reducing Complaints Without Slowing Down
How can a crew cut down on mailbox strikes and angry calls about driveway windrows without adding hours to every route?
Read the guide
Finding the HTS Code for a Plow Edge: Steps, Pitfalls and Questions for Your Broker
You import plow edges and your broker asks for the tariff classification (HTS code) for the product.
Read the guide
ASTM B611 for Buyers: What a High-Stress Abrasion Test Measures and What It Does Not
Standard in brief: ASTM B611-21 is a test method for determining the high-stress abrasion resistance of hard materials.
Read the guide
Commercial Invoice and Packing List: The Fields That Cause Customs Holds
A shipment of wear parts is held and the broker asks for a corrected invoice.
Read the guide
Why Carbide and Steel Expand Differently: What It Means for Brazed Joints
A supplier says its carbide is brazed to steel, and a buyer wonders why the joint is a weak point.
Read the guide
Cul-de-Sacs and Turnarounds: Moving Snow Without Burying Driveways or Wearing Edges
How should a crew clear a cul-de-sac without burying driveways or striking the edge on the island or curb?
Read the guide
Elongated Bolt Holes and Bushing Wear in Segmented Blades
Segment bolts keep working loose, and when you pull one the hole looks oval and the bushing is worn.
Read the guide
Five-Minute Pre-Storm Briefing: Routes, Hazards, Edge Condition, Spare Plan
A storm is coming, crews are about to head out and the briefing is either skipped or a long monologue.
Read the guide
Hot Wash Water on a Cold Carbide Edge: A Careful Answer
After a long night of plowing, is it safe to spray hot water on a cold carbide edge?
Read the guide