Five-Minute Pre-Storm Briefing: Routes, Hazards, Edge Condition, Spare Plan

A storm is coming, crews are about to head out and the briefing is either skipped or a long monologue.

Illustration for pre storm briefing checklist: a road in perspective, a plow truck and a line chart
4 answersAsked 30 October 2026·Seasons & Calendar

SENTHAI Editorial Team

TALK / SEASONAL PLANNING DISCUSSION
Buyer question

Before storms our briefing is either skipped or turns into a long monologue. What would a tight five-minute pre-storm briefing look like, covering routes, hazards, edge condition and spares?

Scenario: a storm is coming, crews are about to head out and the briefing is either skipped or a long monologue. Direct answer: run a five-minute briefing in four parts, with set times and a script. Short, regular briefings are more likely to be remembered and to be held at all. The format is a template, not a standard.

Template: the script

Minutes Part Say Ask
0-1 1. Routes Who has which route, in what order, and any changes from the plan Does anyone know of a closure or an event on a route?
1-2 2. Hazards Known hazards by route, such as raised covers, new humps or hidden curbs, and any new ones this week Has anyone seen a new one?
2-4 3. Edge condition Read out each truck’s edge state from the handover cards or the pre-shift check; flag any that need changing first Does anyone want a fresh edge before leaving?
4-5 4. Spares and contact Where spares and tools are, who to call, what triggers a call and when we check in Any questions? Everyone clear?

Running it well

A briefing is a meeting with a time limit and a decision at the end.

  1. Stand up and keep to time. A timer on the whiteboard helps.
  2. Use a one-page sheet with the four parts so that nothing is left out.
  3. Let drivers speak in parts 2 and 3. They often know a hazard before the supervisor does.
  4. Close with a sign-off: a line on the sheet with the date, the supervisor and a note of any items to follow up.
  5. Follow up on any hazard or edge issue raised, at the next briefing.

If you only have two minutes

Do part 3 and part 4: edge state and contact plan. Those prevent the most avoidable trouble in the first hour.

Limits

A briefing does not replace a pre-trip check, and it is only useful if what is said is acted on. Keep the sheets with the storm log.

Keeping it fresh

If briefings become routine, change who gives part 2 or 3 each time. A new voice makes people listen, and it spreads ownership of the hazards list across the crew.

Boundary: This is a suggested format; it is not a standard and does not replace pre-trip checks.

↳ Replying to SENTHAI Editorial Team

Keep the briefing at the truck or at a board where the edges are visible. Hold up a worn edge as an example now and again. Ask each driver to say one thing they will watch tonight. That small commitment makes the briefing more than a lecture. If a driver raises a hazard, write it on the sheet there and then.

↳ Replying to Field-check perspective

Bring the latest maintenance status to part 3: which trucks have had a new edge, which are close to a change, and which have open defects. Update it after each storm. If a truck goes out with a known issue, record who accepted it. The briefing is the best place to catch problems before the truck leaves the yard.

↳ Replying to Maintenance perspective

Part 4 is where stock problems surface: a truck low on a spare edge or bolt kit. Note shortages on the sheet and pass them to purchasing the same day. Over a season, the briefing sheets show what ran short and when, which helps you set safety stocks and make your case to whoever approves orders.

Next step

Scenario: a storm is coming, crews are about to head out and the briefing is either skipped or a long monologue.