Buyer question

If an airport buys snow equipment or edges with AIP funds, what must the buyer check about Buy American, and what does the FAA say about waivers?

Short answer
Confirm the requirement applies to the purchase, ask the supplier for the content and final-assembly information the FAA’s process needs, check whether a nationwide waiver covers the equipment and talk to the FAA regional office or Airport District Office before award. This is a summary of one FAA page, not legal advice, and requirements change, so check the current source.

What the FAA page says

As read on 24 October 2026, the FAA’s Buy American Preference Requirements page says the preferences under 49 U.S.C. § 50101 require that all steel and manufactured goods used in Airport Improvement Program (AIP) funded projects be produced in the United States, and that grant recipients must certify this. It says FAA may waive the preferences if certain conditions exist, listing four:

  1. applying the preferences would be inconsistent with the public interest;
  2. the U.S.-produced steel or goods are not produced in a sufficient and reasonably available amount or are not of satisfactory quality;
  3. the cost of U.S.-produced components and subcomponents is more than 60 percent of the cost of all components of the equipment, and final assembly occurs in the United States; or
  4. including domestic material will increase the cost of the overall project by more than 25 percent.

The page also says to request a waiver on a specific project through the regional office or Airport District Office, that forms for a content calculation and final assembly questionnaire may be required, and that FAA headquarters keeps a list of equipment that has received a nationwide waiver, so sponsors need not request waivers for equipment on that conformance list.

Checklist for buyers

Check Why
Is the purchase part of an AIP-funded project? The requirement applies to AIP-funded projects
Does the specification require compliance in the solicitation? Bidders must know up front
Is the item on a nationwide waiver or conformance list? May avoid a separate request
Can the supplier document U.S. content and final assembly? The waiver forms ask for it
Has the FAA regional or district office been consulted? They decide waivers
Is the certification signed after verification? The sponsor certifies

What this does not answer

  • It does not say whether any particular edge or plow qualifies.
  • It does not cover other funding programs, which have their own rules.

Boundary: General information from one FAA page, not legal advice; requirements and lists change, so verify with the FAA and your grant documents before any decision.

↳ Replying to SENTHAI Editorial Team

Put the Buy American requirement into the solicitation and ask bidders for content and final-assembly information at the bid stage, in writing. Keep the certification and the supporting documents with the project file. Before award, check the current FAA lists and talk to your FAA office. Do not rely on a supplier’s say-so without the documents.

↳ Replying to Purchasing perspective

Do not assume that a product is acceptable because a similar one was bought before. Ask each bidder how the product is made and where final assembly takes place, and check whether it is on the FAA’s list. If a waiver is needed, start early, since the process takes time and may affect the schedule.

↳ Replying to Selection perspective

Keep the purchase documents with the equipment records, so that later replacement parts can be matched to the original approval. Ask the supplier whether replacement edges are covered under the same terms. If the maintenance team wants to substitute another brand, check with purchasing first and do not mix unverified parts into funded equipment.

Next step

Question: if an airport buys snow equipment or edges with AIP funds, what must it check about Buy American?

Send us a blade drawing and get a quote back

Tell us the machine, the material you are clearing and the wear life you need. Our engineers reply with the edge profile, carbide grade and packing that fit the job — usually within one working day.