A district plows both concrete and asphalt and sees different edge wear.

Illustration for plowing concrete roads snow plow: a decision tree, a balance scale and a clock
4 answersAsked 26 October 2026·Operating Practice in the Field

SENTHAI Editorial Team

TALK / FIELD OPERATIONS DISCUSSION
Buyer question

We plow both concrete and asphalt lots. Why does edge life differ, and how should we plan for it?

Scenario: a district plows both concrete and asphalt and sees different edge wear. Direct answer: pavement type is one of several factors, and the public state comments suggest it can matter, but they do not give a rule. I draw only on Clear Roads’ published product-experience feedback, which records operator comments and ratings, not controlled tests. Product names are left out.

What states reported

Agency and period Comment (paraphrased)
Utah DOT (2012-2014) A heavy test on 10-year-old concrete using the same driver and truck found one system outlasted ten others; cost was high and wider testing was planned for per-hour and life-cycle costs
Minnesota DOT (2007-2008) On one route with 45 miles of very poor concrete with many cross cracks and potholes, a flexible edge lasted 40 hours, versus 85.5 and 108 hours on other routes; operators felt it caught on the concrete and the plow tripped more
Illinois DOT (2011-2016) A flexible blade lasted from 1 to 5 years depending on the surface, blacktop versus concrete
Iowa DOT (2016-2017) One blade type was used on micro surface and concrete with good results and seemed to work well on packed snow

The comments differ in product, year and method. They suggest that surface condition, not only surface type, affects results.

Planning for mixed routes

Mixed routes need the log split by surface, or the average hides both.

  1. Log by surface. Record edge hours on concrete and asphalt separately.
  2. Look at condition. Joints, cracks and potholes matter as much as the material.
  3. Stock by route type. If one route type wears edges faster, hold more spares for those trucks.
  4. Trial one change. Try one alternative edge on the roughest route.

Questions for suppliers

Concrete with joints is a different wear problem from asphalt, and a life figure without conditions is not usable.

  1. What experience do you have on concrete roads with joints? Joint edges strike the blade in a way plain asphalt never does.
  2. Can you share the conditions behind any life figure? Ask for pavement type, joint spacing and salt use, not just hours.
  3. Is there a design that handles joints better, and what are its trade-offs? The trade-off is usually cost, weight or a shorter usable edge.

Lesson

Do not budget one life figure for all your routes. Use your own logs split by surface and condition.

How to read hours-before-replacement figures

Hours are only meaningful with the surface, speed, driver and truck stated. The Minnesota note was careful about this: it described the mix of seal coat, micro-surfacing, bituminous and concrete on each route, and it still said that plowing habits and speed were hard to record. Keep the same discipline in your own logs, and record the surface type for every edge change.

Boundary: state comments are operator feedback, not controlled tests; no rule is claimed. Product names are omitted.

↳ Replying to SENTHAI Editorial Team

Mixed districts need a mixed plan. Build separate life estimates for each route type from your own records, and let the stock levels follow. A single average hides the routes that eat edges and overstates the ones that do not. Review the split after each season and adjust the spares where wear is highest.

↳ Replying to Field-check perspective

The comments show how much results depend on conditions. A 40-hour result on rough concrete and a 108-hour result on other routes came from the same type of edge. Beware of any life figure that does not say where and how it was measured, and ask for the conditions before you use a number in a budget.

↳ Replying to Selection perspective

Quote requests should say what surfaces the edge will work on. Suppliers can then answer with relevant experience, or admit they have none. Ask for references on similar surfaces and call them. If the answer is only that it worked well, ask for hours and conditions, and treat it as a lead to test.

Next step

Scenario: a district plows both concrete and asphalt and sees different edge wear.

Send us a blade drawing and get a quote back