Skip to content
Carbide snow plow blades, inserts and wear parts — engineered in Rayong, Thailand
Request a Quote

Comparing Three Edge Types on One Route Set: A Design for a County Road Commission

How can a county road commission fairly compare three edge types on the same set of routes?

Illustration for county road commission plow edges: a road in perspective, a data table and a sun
4 answersAsked 2 November 2026·Public Agencies & Research

SENTHAI Editorial Team

TALK / PUBLIC AGENCY DISCUSSION
Buyer question

How can a county road commission fairly compare three edge types on the same route set, and what rotation, data and decision rules should it set before the season?

Short answer
Rotate the edge types across trucks and route groups so that no edge type always gets the hardest route, record hours and wear in the same way for each and set the decision rule before the season. I report no county’s results; this is a design you can use with your own data.

The rotation idea

With three edge types (A, B, C) and three route groups of similar character (1, 2, 3), assign them in a Latin-square pattern so each type is used on each route group over three periods.

Period Route group 1 Route group 2 Route group 3
First third of season A B C
Second third B C A
Last third C A B

Edges are changed at the period boundaries, or when worn out, whichever comes first, and each edge is logged by hours.

Data to record

The data set is what makes a three-way comparison possible, and every field has a job.

  1. Edge ID, type, supplier and price. Without the ID, the rest is anonymous.
  2. Truck, route group and period.
  3. Hours of plowing. The denominator for every comparison you will make.
  4. Wear readings and photos at fixed intervals.
  5. Failures, chips and strikes, with locations.
  6. Fitting time and any problems.
  7. Driver comments.

Decision rules to write in advance

Write the rules before the trial starts, because every rule is easier to agree while no result is on the table.

  • The main measure, such as cost per hour of use including fitting.
  • A minimum number of hours per edge before a reading counts.
  • How to treat early failures: as data, not as exclusions.
  • What difference is large enough to act on, for example a margin your board accepts.

Pitfalls

A three-way comparison fails quietly, and usually for one of these four reasons.

  • Letting drivers pick edges. Preference is a variable you did not control, and it correlates with the result.
  • Comparing calendar time rather than hours. Storms differ, and dates hide how much work each edge did.
  • Changing equipment or routes mid-trial without recording it. The unrecorded change then explains the result instead of the edge.
  • Stopping after one storm. One storm is weather; three are a pattern.

A note on fairness

Even with rotation, trucks differ: a newer truck, a better driver or a different plow can give one edge type an advantage. Log the truck and driver pool with each edge, and look at whether the differences between edge types are larger than the differences between trucks. If they are not, say so in the report.

Report

Summarise the design, data and result in a page, including limitations such as the number of edges and the length of the season, and keep the raw data.

Limits

A single season cannot settle every question. Treat the result as evidence for your own routes.

Boundary: No county result is reported; the design is a method, and one season cannot settle every question, so state its limits when you report.

↳ Replying to SENTHAI Editorial Team

Write the decision rule before the season and keep it short: the main measure, the minimum hours and the margin that counts. Ask each supplier to confirm that the edge fits your plows. Rotate types across routes so that no type gets an easy ride. Review the results with the crews, and decide with the rule you set.

↳ Replying to Selection perspective

Measure wear at the same intervals with the same gauge and photograph with a scale. Record strikes and chips with their location. Do not swap edges between trucks outside the plan without writing it down. Give honest driver comments in the log, including anything that felt different about one type.

↳ Replying to Field-check perspective

Get itemised prices and trial terms for each type, including credit for early failures. Keep the data and the decision rule on file, since a public body may need to show how it chose. After the season, use the cost per hour of use and fitting time in the next bid specification, and share the method with suppliers.

Next step

Question: how can a county road commission fairly compare three edge types on the same set of routes?

Send us a blade drawing and get a quote back

Tell us the machine, the material you are clearing and the wear life you need. Our engineers reply with the edge profile, carbide grade and packing that fit the job — usually within one working day.