Profit per Push: Where Edge Wear Sits in a Contractor’s Per-Event Price

Where does edge wear fit in the price I charge per push, and how do I know if I am covering it?

Illustration for snow plowing profit per push: a new and a worn wear bar side by side, a calculator and a sun
4 answersAsked 30 October 2026·Cost & Budget

SENTHAI Editorial Team

TALK / COST AND BUDGET DISCUSSION
Buyer question

I charge by the push but I’m not sure my price covers edge wear. How do I turn edge, bolt and shoe costs into a cost per push I can compare with what I charge?

Short answer
Convert edge cost into cost per hour of use, then into cost per push using your average push time. The numbers below are invented to show the method; replace them with your own records. This is not pricing advice for your market.

Worked example (invented numbers)

Suppose a contractor has one truck with a plow. All figures are made up.

  1. Edge cost: 400 per edge, installed.
  2. Edge life: 80 hours of plowing, from the contractor’s own log.
  3. Cost per hour: 400 divided by 80 gives 5.00 per hour.
  4. Hours per push: an average push takes 2.5 hours.
  5. Edge wear per push: 5.00 times 2.5 gives 12.50.

Add the same working for bolts and shoes, say 3.00 per hour in total, giving 7.50 per push. Edge, bolts and shoes together come to 20.00 per push in this example.

Where it sits in the price

Line Example amount per push (invented)
Driver labour 75.00
Fuel 40.00
Edge, bolts and shoes 20.00
Other repairs and maintenance 25.00
Insurance, overhead and equipment cost 60.00
Profit target 30.00
Price per push 250.00

In the example, edge parts are 8% of the price. If wear were doubled by hard surfaces, 20.00 would become 40.00, and the profit line would shrink unless the price rose.

Checking against your own records

The check is only as good as the two numbers you put into it.

  • Use real edge life from your own log, by surface type.
  • Use real push times, not an estimate.
  • Revisit after each season, since prices and wear change.

Limits

These figures are invented and do not reflect any market. Local competition, contract terms and taxes also shape the price.

Sensitivity check

Rerun the example with edge life 20% shorter and 20% longer. If the per-push figure moves by only a dollar or two, wear is not your main risk; if it moves a lot, tighten your records and your contract wording.

One more check: compare your result with what you actually earned per push last season, after all costs. If the two differ a lot, either the records or the assumptions are off, and it is worth finding out which before you quote next year’s contracts.

Boundary: Every figure is invented to show the method and none reflects a real market, price or contract.

↳ Replying to SENTHAI Editorial Team

Update your cost per hour whenever the edge price changes, and check that your quotes reflect it. If a supplier raises prices, work the change through to the per-push figure before you decide whether to absorb it or pass it on. A small change per hour becomes a real sum over a season of pushes.

↳ Replying to Purchasing perspective

The edge life figure comes from your records, so keep them honest. Note the surface and conditions each time you change an edge. If life is falling, find out why before you raise prices: a set-up problem or an unmarked hazard may be costing you more than the market. Fixing it improves margin directly.

↳ Replying to Maintenance perspective

Use cost per hour, not purchase price, to compare edges. A dearer edge that lasts more than proportionally longer can lower cost per push, but only your records can show it. Trial an alternative on one truck for a season and put its numbers through the same worked example before you change everything.

Next step

Question: where does edge wear fit in the price I charge per push, and how do I know if I am covering it?