Storm Logs That Protect You: What to Record About Surface Conditions and Equipment

A client disputes whether you did the work, and your memory is the only evidence.

Illustration for snow removal storm log: a camera, a magnifying glass and a sun
4 answersAsked 28 October 2026·Contractor Business

SENTHAI Editorial Team

TALK / CONTRACTOR BUSINESS DISCUSSION
Buyer question

A client disputed whether we plowed their lot on a stormy night, and we had nothing but memory. What should we record about every storm so that we are protected and can plan better?

Scenario: a client disputes whether you did the work, and your memory is the only evidence. Direct answer: keep a short log for every storm, filled in at the time, with the same fields every time. The template below serves disputes, maintenance planning and pricing. It is a template, not a legal requirement.

Template

Field Example entry Why it helps
Date and site Date, site name or ID Links the record to a place
Start and finish time Time arrived, time left Shows when work was done
Conditions on arrival Snow depth estimate, ice, temperature, wind Explains the work
Work done Passes, areas, pile locations Shows scope
Treatment Product and approximate amount, if used Tracks cost and compliance
Truck and driver Unit ID, name Links to equipment records
Edge and shoe condition Fine, worn, damaged; change needed Plans maintenance
Issues Obstacles, damage, complaints Protects against later claims
Photos Before and after, time-stamped Backs up the record

How to keep it light

A log survives when it costs two minutes at the site.

  1. Use one page or one phone form, not three.
  2. Fill it in at the site, not at the end of the week.
  3. Use tick boxes where you can.
  4. Take two photos, a wide and a close, at the start and the end.
  5. Store them in one folder per site and date.

What to do with the logs

Review monthly. Look for sites with repeated issues, trucks with edge problems and storms where costs ran high. Use the findings in pricing and in maintenance planning.

Limit

How long to keep records and what they must show may be set by your contract, insurer or local law. Ask them.

A common mistake

Logs often fail because they ask for too much. A crew that must fill in twenty fields after a night shift will skip them. Start with five fields and add more only when you know you will use them.

A five-field starter version

If the table feels long, begin with five fields: site, date, start and finish times, work done and one photo. Add conditions and edge condition once the crew is filling in the first five reliably. A short record kept every time is worth more than a detailed form used once. Review the first month together and ask the crew what they would remove.

Boundary: No record-retention rules are cited; check your contract, insurer and local law for what you must keep and for how long.

↳ Replying to SENTHAI Editorial Team

Fill in the log on site, even if it is only a few words and a photo. A note made at the time carries weight that a reconstruction does not. Take photos with the time stamp on, and include a landmark. At the end of the shift, check that every site on the list has an entry.

↳ Replying to Field-check perspective

Use the edge and shoe field to plan changes, and link it to the truck’s inspection record. If the log shows repeated chips on one site, look at what is on that site. A monthly review of the logs, with a short list of actions, turns record-keeping into better maintenance. Attach the monthly log review to the post-season meeting so that actions are followed up.

↳ Replying to Maintenance perspective

Logs help you price. After a season you can see how many passes a site really needed and what it cost in edges and treatment. Use that to quote with confidence. If a client disputes an invoice, the log and photos let you answer calmly and with facts. Quote from the log in any reply to a dispute, so the answer rests on dates and photos.

Next step

Scenario: a client disputes whether you did the work, and your memory is the only evidence.

Send us a blade drawing and get a quote back

Tell us the machine, the material you are clearing and the wear life you need. Our engineers reply with the edge profile, carbide grade and packing that fit the job — usually within one working day.