Choosing Which Blades to Trial: A Shortlist Method That Uses Public Data

An agency or contractor wants to trial new blades but cannot test everything.

Illustration for snow plow blade evaluation: a county grid map, a line chart and a plow truck
4 answersAsked 2 November 2026·Public Agencies & Research

SENTHAI Editorial Team

TALK / PUBLIC AGENCY DISCUSSION
Buyer question

How can we choose which plow blades to trial using public data such as Clear Roads feedback and bid results, and how do we score and cut the list to two or three?

Scenario: an agency or contractor wants to trial new blades but cannot test everything. Direct answer: build a long list from public sources, score it against your own needs, drop what fails a fit or support test and trial the top two or three against your current blade with a standard protocol. I rank no product. The sources named below are public, and I describe only what the pages say.

Public sources to build the long list

Source What it offers Caution
Clear Roads Product Experience Feedback 2006-2021 State ratings and comments on many blades and plows Opinions from few units; some entries are old
Clear Roads Project 18-02, High Performance Blade Evaluation (completed January 2023) The project page says it was to compile and analyse field tests at several state DOTs and develop a field test protocol and cost-benefit method; products include a Quick Reference Guide and final report I read the project page only, not the report
Public bid results and tabulations What agencies bought and at what total price Totals hide quantities and specs
Supplier references Agencies using the product now Ask for a phone call, not just a name

Shortlist method

The shortlist is a filter rather than a ranking, and the weights should be set before the candidates arrive.

  1. List needs: surfaces, speeds, hazards, plow models, climate and budget.
  2. Collect candidates with a note on where each came from; provenance matters when you defend the choice.
  3. Screen on fit: hole pattern, dimensions and compatibility.
  4. Screen on evidence: recent field evidence in conditions like yours.
  5. Screen on support: local parts, lead time and vendor response.
  6. Score them in a table with weights set in advance.
  7. Trial the top two or three against the current blade on matched trucks.

Template: scoring

Criterion Weight (you set) Blade A Blade B Blade C
Fit to plows
Field evidence
Price per set
Vendor support
Fitting time

Limits

This is a method, not a recommendation. A shortlist is only as good as its sources, and the trial decides.

Keep the trial honest

Decide the stopping rule before you start: how many hours per edge, how many trucks and what result would make you adopt, extend or drop a blade. Record every failure, including ones you think were unlucky. A trial that discards inconvenient results teaches nothing. When it ends, write a one-page summary with the data and its limits, and file it with the shortlist so that the next review starts from facts.

Boundary: No product is ranked and only the 18-02 project page was read, not its report; the trial, not the shortlist, should decide.

↳ Replying to SENTHAI Editorial Team

Write the needs list and the weights before you look at products, so that the scoring is not shaped by the first brochure you read. Drop candidates that fail on fit or support early. Keep the trial to two or three. Use the Clear Roads protocol ideas, such as matched trucks and cost per hour, and record why each candidate was included or removed.

↳ Replying to Selection perspective

Ask each shortlisted supplier for references, trial terms and credit for early failures. Compare prices on cost per hour of use after the trial, not on piece price. Keep the long list, scores and reasons on file, since a public buyer may need to show how products were chosen. Check local rules on trials and sole-source purchases.

↳ Replying to Purchasing perspective

Run the trial on matched trucks and record hours, wear and damage in the same way for each blade. Photograph wear with a scale at fixed intervals. Keep driver comments about handling and noise. Be willing to stop a trial early if a product is unsafe, and record why. Record each stop and why.

Next step

Scenario: an agency or contractor wants to trial new blades but cannot test everything.

Send us a blade drawing and get a quote back

Tell us the machine, the material you are clearing and the wear life you need. Our engineers reply with the edge profile, carbide grade and packing that fit the job — usually within one working day.