Skip to content
Carbide snow plow blades, inserts and wear parts — engineered in Rayong, Thailand
Request a Quote

A 10-Point Tariff Change and Landed Cost: A Sensitivity Table

If the duty on my edges moved by ten percentage points, what would it do to landed cost per edge?

Illustration for tariff impact on import prices: a stamped document, a price tag and a checklist
4 answersAsked 30 October 2026·Cost & Budget

SENTHAI Editorial Team

TALK / COST AND BUDGET DISCUSSION
Buyer question

If the duty on our edges changed by ten percentage points, how much would landed cost per edge move, and how do I build a sensitivity table of my own?

Short answer
It moves the duty line by ten percent of the dutiable value, which is usually a smaller change to the total than people fear, but it also changes anything calculated on top of duty. The figures below are invented to show the method. I state no real rate or measure; use your own broker’s figures.

Worked example (invented numbers)

Suppose an edge has these costs per unit, all made up:

  • Factory price: 100.00
  • Freight and insurance to port: 12.00
  • Dutiable value (assume factory price here for simplicity): 100.00
  • Broker, handling and inland freight: 14.00
Duty rate (invented) Duty per edge Landed cost per edge Change vs 0%
0% 0.00 126.00 –
10% 10.00 136.00 +10.00 (+7.9%)
20% 20.00 146.00 +20.00 (+15.9%)
30% 30.00 156.00 +30.00 (+23.8%)

Each ten-point step adds 10.00 per edge in this example, about 8% of landed cost at the start. If an order is 500 edges, a ten-point step is 5,000 on the order.

What the simple table leaves out

A simple table is a first approximation, and the fees it misses are usually the ones that scale with value.

  • Some fees are calculated as a percentage of value, so they may move too.
  • The dutiable value rules vary; freight may or may not be included.
  • The supplier may share or shift cost, and the currency may move.
  • Quantity breaks and freight change per-unit cost.

How to build your own

Landed cost is a small model, and building it once makes every future quote comparable.

  1. List all cost lines per unit and mark which depend on value. Freight usually does not; duty and fees usually do.
  2. Ask your broker for the dutiable value basis and the current duty and fees. The basis matters as much as the rate.
  3. Build a table with the duty rate as the variable and landed cost as the result. That is the sensitivity you are buying against.
  4. Add a second table for order quantity. Fixed costs per shipment behave differently at volume.
  5. Use it in negotiations and in the decision to order now or later. A model you never open is just a spreadsheet.

Limits

All numbers are invented. The table shows method, not any market or measure.

Two-way sensitivity

Extend the table with factory price on the other axis, in steps of five percent. A two-way grid shows whether a supplier’s discount or a duty change matters more to the final landed figure.

Boundary: Every figure is invented to show method; no real duty rate, measure or price is stated, so verify yourself with your broker.

↳ Replying to SENTHAI Editorial Team

Use a table like this to see how much price movement a supplier discount would need to offset a duty change. If a 10-point step costs 10 per edge, a supplier would need to cut that much to make you whole. Put the table in front of suppliers when negotiating, and ask who bears changes that occur after you order.

↳ Replying to Purchasing perspective

Run the table for each supplier or country you are considering, using real figures from your broker. A cheaper factory price can disappear once duty and freight are added. Do not choose on one line. Compare landed cost with and without a possible change, and note which options are most exposed to a swing.

↳ Replying to Selection perspective

Bring your usage to the table: how many edges you actually use in a season. Overbuying to avoid a change can tie up cash and storage space. Under-buying risks running short. Use your logs to size the order, and keep the sensitivity table with your plan as a record of the assumptions.

Next step

Question: if the duty on my edges moved by ten percentage points, what would it do to landed cost per edge?